Velo X Aerospace

2023
Drafting a design
Redesigning Flight

When we decided we wanted to take a leap into the future of flight and revolutionize the way we take to the sky, we hit the drawing board.  With safety and innovation being our top concerns, we were constantly updating features and design to ensure we create the highest quality aircraft possible. 

2023
Sourcing Components
Only the best

With our design locked in we began researching to find the most cutting edge technology in components to meet our highest standards in safety and innovation.

2023
Building a Prototype
The First Prototype

Once we were able to source components to meet our highest standards, we started to put it all together in our first active prototype aircraft.

2023
Testing the Components
Validating our Components

With each and every component added to our prototype came a test of its quality.  From durability testing and evaluation to verifying every claim made by the manufacturer, we tested every detail of every sourced component to verify they lived up to our standards. All and any components we had any doubt on were marked and noted for replacement with a better component in future builds.

2024
First test flights
Getting off the ground.

With our first prototype ready  to power up, we moved to the field for testing.  Tethered flight tests, one after another  flooded us with data and new information from every test.  New data allowed us to constantly improve in design and programming making adjustments and refining every aspect of our prototype.

2024
The Final Design
The Velociter X-1 is born.

With our gained knowledge and multiple revisions the design for the final product was born.

2024
Secure first round funding
Open to Investors for funding.

We are excited to announce that we have successfully secured our first round of funding! If you're an investor, stay tuned for future opportunities to get involved.

2025
Two more
Building Two Additional Prototypes.

We plan to take everything we learned from our first build and implement those changes into two new prototypes.

2025
Testing
Putting them to the test.

Knowing what needed to be changed, we can put our sights on specific points to test on top of all previous safety and systems test used on our first build. Starting with systems tests along with structural integrity, We will test every aspect of our aircraft moving from tethered to unmanned flight and finally to manned flight testing.

2025
The Reveal
EAA AirVenture 2025

Once we are sure we have a product that exceeds all of our safety and performance standards, our plan is to make our reveal at EAA AirVenture OshKosh 2025. Here we plan to introduce the world to Velo X Aerospace's Velociter X-1 and open for pre-orders.

2025
Production Facility
Setting up for Production.

Once our reveal is complete and we are open for orders, we plan to begin setup on a dedicated production facility for the Velociter X-1.

2026
Certifications and Final Tests
The Final steps

With our production facility up, certifications nearing completion, and the training center being set up, things are getting exciting! We're now reaching out to owners with orders, letting them know their X-1 is gearing up for production.

2026
Delivering the product
Delivering our first units and Global Sales / Distribution.

The plan is to ship our first aircraft and begin full distribution by end of year 2026